Dragon Oil Notes Completion, Testing Results for Lam Well

Dragon Oil plc published the results of successful completion and initial testing for the Dzheitune (Lam) 28/174 development well and sidetrack of the Dzheitune (Lam) 13/144C.

The Dzheitune (Lam) 28/174 well was completed as a single producer to a depth of 6,483 feet (1,976 meters). The well tested for initial production at 1,705 barrels of oil per day ("bopd"). The drilling rig will undergo scheduled maintenance before skidding to spud the next well on the Dzheitune (Lam) 28 platform.

The sidetrack of the Dzheitune (Lam) 13/144C well yielded the initial flow rate of 956 bopd from a single string. The reached depth was 8,652 feet (2,637 meters). The rig has moved to add intervals on the Dzheitune (Lam) 13/171 well; while testing and optimization work continue on this well.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours