Dragon Oil Notes Completion, Testing Results for Lam Well

Dragon Oil plc published the results of successful completion and initial testing for the Dzheitune (Lam) 28/174 development well and sidetrack of the Dzheitune (Lam) 13/144C.

The Dzheitune (Lam) 28/174 well was completed as a single producer to a depth of 6,483 feet (1,976 meters). The well tested for initial production at 1,705 barrels of oil per day ("bopd"). The drilling rig will undergo scheduled maintenance before skidding to spud the next well on the Dzheitune (Lam) 28 platform.

The sidetrack of the Dzheitune (Lam) 13/144C well yielded the initial flow rate of 956 bopd from a single string. The reached depth was 8,652 feet (2,637 meters). The rig has moved to add intervals on the Dzheitune (Lam) 13/171 well; while testing and optimization work continue on this well.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Project Procurement & Contracts Advisor (Subsea Equipment)
Expertise: Contracts Engineer|Purchasing|Subsea Engineering
Location: Houston, TX
 
United States Canonsburg: Service Manager
Expertise: Customer Service|WellSite Supervisor
Location: Canonsburg, PA
 
Drilling Engineer II Job
Expertise: Drilling Engineering|Petroleum Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $53.92/BBL 2.79%
Light Crude Oil : $51.08/BBL 2.66%
Natural Gas : $3.3/MMBtu 3.22%
Updated in last 24 hours