Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


Please enable Javascript to view this content.
advertisement

ATP Wraps Up Workover at Telemark Well

change text size

ATP Oil & Gas Corporation announced the completion of the workover at its Mississippi Canyon (MC) Block 941 A-2 well located in the Mirage Field at the Telemark Hub. The well was completed with 3 ½ inch tubing at a measured depth of 17,140 to 17,401 feet to add the Miocene B Sand completion to the wellbore for field development optimization. Initial test flow rates are at 4,000 barrels equivalent per day (boepd) of which 90 percent is oil. The A-2 well will be tied back to the facility immediately and is expected to produce at a rate of 4,000 to 5,000 boepd.

The MC 941 A-2 well produces through the ATP Titan floating drilling and production platform. ATP operates the ATP Titan and Telemark Hub which is in approximately 4,000 feet of water with a 100% working interest and holds a 100% ownership in ATP Titan LLC which owns the ATP Titan and associated pipelines and infrastructure.

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies

Most Popular Articles
From the Career Center
Jobs that may interest you
Reservoir Engineer
Expertise: Reservoir Engineering
Location: Al Khobar
 
Subsea Controls Engineer
Expertise: Instrument & Controls Engineer, Subsea Engineering
Location: Houston, Texas, TX
 
Sr. Reservoir Engineer
Expertise: Petroleum Engineering, Reservoir Engineering
Location: Pittsburgh, PA
 
search for more jobs