Fluor to Build Ku-Maloob-Zaap Production Platform

ICA Fluor, the industrial construction joint venture of Empresas ICA, S.A. B de C.V. and Fluor Corporation (FLR), announced Tuesday the signing of a contract with Pemex Exploration and Production for the construction of an offshore production platform for the Ku-Maloob-Zaap field in the Gulf of Mexico with a total contract value of $95 million. Fluor’s share of the contract, $47.5 million, will be booked in the second quarter.

ICA Fluor and its subsidiary Industria del Hierro will be responsible for the procurement, construction, testing, and load out of the Ayatsil-C platform. Weighing 11,832 tons and reaching 433 feet (132 meters) deep, Ayatsil-C the first structure of this size to be installed by Pemex. The project is expected to be completed by the end of 2013.


Click on the button below to add a comment.
Post a Comment
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Production Engineering
Location: Houston, TX
Expertise: Electrical Technician
Location: Odessa, TX
Structural Engineer, USA
Expertise: Structural Engineering
Location: USA
search for more jobs

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours