Fluor to Build Ku-Maloob-Zaap Production Platform

ICA Fluor, the industrial construction joint venture of Empresas ICA, S.A. B de C.V. and Fluor Corporation (FLR), announced Tuesday the signing of a contract with Pemex Exploration and Production for the construction of an offshore production platform for the Ku-Maloob-Zaap field in the Gulf of Mexico with a total contract value of $95 million. Fluor’s share of the contract, $47.5 million, will be booked in the second quarter.

ICA Fluor and its subsidiary Industria del Hierro will be responsible for the procurement, construction, testing, and load out of the Ayatsil-C platform. Weighing 11,832 tons and reaching 433 feet (132 meters) deep, Ayatsil-C the first structure of this size to be installed by Pemex. The project is expected to be completed by the end of 2013.

WHAT DO YOU THINK?

Click on the button below to add a comment.
Post a Comment
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
High Line Inspector
Expertise: Electrical Technician
Location: Midland, TX
 
Director Engineering Studies
Expertise: Field Development|Floating Systems|Installation Engineer
Location: Houston, 
 
Associate Electronic Technician - Electronic Technician II
Expertise: Electrical Technician
Location: El Reno, OK
 
search for more jobs

Brent Crude Oil : $54.15/BBL 0.51%
Light Crude Oil : $51.47/BBL 1.45%
Natural Gas : $3.22/MMBtu 3.30%
Updated in last 24 hours