Dragon Oil Wraps Up Initial Testing Ops at Lam Well

Dragon Oil plc announced the successful completion and initial testing of the Dzheitune (Lam) C/167 development well.

The well was completed as a dual producer to a depth of 9,072 feet (2,765 meters). It tested for initial production at 1,682 barrels of oil per day at the short string with the long string testing at 1,714 barrels of oil per day. The combined rate of initial production was 3,396 barrels of oil per day. The drilling rig has skidded to the next slot and spudded the Dzheitune (Lam) C/170 well.

Dr. Abdul Jaleel Al Khalifa, Chief Executive Officer, commented, "I am pleased to report solid drilling results from the first appraisal and development well to have been completed from the new wellhead and production Dzheitune (Lam) C platform. The drilling results together with logs and pressure tests indicate that the prolific oil bearing sands in the reservoirs under the Dzheitune (Lam) 28 platform extend to the west towards the Dzheitune (Lam) C platform location. The findings from this well further prove our understanding of the Dzheitune (Lam) West area."


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours