Texon Runs Production Tests at 2nd Eagle Ford Well

Texon has advised that the second Eagle Ford well in which Global has an interest (Tyler Ranch EFS #2H) has tested oil and gas at the rates of 1,488 bopd and 700 mcfgpd (combined 1,605 boepd) through a 16/64" choke at a flowing tubing pressure of 3,000 psi.

The well is located just to the north of the first Eagle Ford well (Tyler Ranch EFS #1H) which had an initial test rate of 1,200 bopd through the same sized choke. Tyler Ranch EFS #2H also has a higher flowing pressure than the first Eagle Ford well. The second Eagle Ford well has been connected for oil and gas production through the EFS #1H production facilities.

Global has a 7.939% working interest (5.95% NRI) in approximately 1,651 acres beneath the Olmos formation including the Eagle Ford Shale. Global's interest in the Leighton prospect also includes a 15% working interest in approximately 873 acres from the surface down to the stratigraphic equivalent of the Olmos formation.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Production Engineering
Location: Houston, TX
Senior Client / Program Manager
Expertise: Geologist|Reservoir Engineering
Location: Seattle, WA
Senior Sales Representative - Oil and Gas
Expertise: Corrosion Engineering|Petroleum Engineering|Sales
Location: Harvey, LA
search for more jobs

Brent Crude Oil : $50.47/BBL 0.98%
Light Crude Oil : $49.72/BBL 1.09%
Natural Gas : $2.76/MMBtu 1.09%
Updated in last 24 hours