Aurelian Starts Flow Test at Polish Well

Aurelian provided the following operational update.

A stabilized flow test, expected to last between 14 and 28 days, has now commenced at the second Siekierki MFHW, Trzek-3. The planned six fracs have been completed without material mechanical issues. Well clean up operations and a Memory Production Log have all been completed.

A further update will be provided at the end of the stabilized flow test.

Trzek-3 is targeting a separate high to other wells in the Siekierki structure with a recoverable resource estimated at between 16 and 28bcf.

The Siekierki project is located on the Poznan licenses which are 100% held by Energia Zachόd Sp. z.o.o., a company owned 90% by Aurelian and 10% by Avobone N.V.

Related Companies

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Petroleum / Facilities Engineering Specialist - Offshore
Expertise: Petroleum Engineering
Location: Houston, TX
Petroleum Engineer
Expertise: Petroleum Engineering
Location: Houston, TX
Reservoir Engineering (Oil / Gas Reservoir Management)
Expertise: Reservoir Engineering
Location: Houston, TX
search for more jobs

Brent Crude Oil : $51.38/BBL 2.44%
Light Crude Oil : $50.43/BBL 2.26%
Natural Gas : $3.14/MMBtu 0.94%
Updated in last 24 hours