Aurelian Starts Flow Test at Polish Well

Aurelian provided the following operational update.

A stabilized flow test, expected to last between 14 and 28 days, has now commenced at the second Siekierki MFHW, Trzek-3. The planned six fracs have been completed without material mechanical issues. Well clean up operations and a Memory Production Log have all been completed.

A further update will be provided at the end of the stabilized flow test.

Trzek-3 is targeting a separate high to other wells in the Siekierki structure with a recoverable resource estimated at between 16 and 28bcf.

The Siekierki project is located on the Poznan licenses which are 100% held by Energia Zachόd Sp. z.o.o., a company owned 90% by Aurelian and 10% by Avobone N.V.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Senior/Principal Industry Specialist - Oil & Gas
Expertise: Chemical Engineering|Mechanical Engineering|Petroleum Engineering
Location: Washington, DC
 
United States Elmendorf: Perforating Specialist, Assoc
Expertise: Production Engineering
Location: Elmendorf, TX
 
United States Duncan: Entry Level Engineer - Electrical/Electronics
Expertise: Drilling Engineering
Location: Duncan, OK
 
search for more jobs

Brent Crude Oil : $55.86/BBL 0.73%
Light Crude Oil : $52.64/BBL 0.51%
Natural Gas : $3.42/MMBtu 0.00%
Updated in last 24 hours