Oilex Preps for Flow Back at Cambay Well

Oilex advised that all eight stages of the fracture stimulation program of the horizontal section in the Cambay-76H well were pumped successfully and according to plan.

The well is currently being prepared for flow to surface to remove stimulation fluids from the formation (well clean-up phase). After the completion of the clean-up operations a flow test will be conducted.

The Cambay-76H "proof of concept" horizontal well is evaluating the production potential of the Y Zone interval of the extensive deep Eocene "tight" reservoirs in the onshore Cambay Production Sharing Contract area, Gujarat, India.

  • Report date: August 9, 2011
  • Status: Prepare for flow back and clean-up operations
  • Past Week's Operations:
    • Completed eight stage fracture stimulation program
    • Completed micro-seismic and pressure data acquisition
    • Preparations for well clean-up operations
  • Objective: Cambay Eocene "tight" reservoir Y Zone
  • Total Depth: 2,740 meters including 610 meters horizontal section

The participating interests in the Cambay PSC are:

  • Oilex Ltd (Operator) 30%
  • Oilex NL Holdings (India) Limited 15%
  • Gujarat State Petroleum Corporation Ltd 55%
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Technical Services Manager - Production Chemicals
Expertise: Chemist|Production Engineering|Stimulation
Location: Midland, TX
 
United States Houston: R&D Cementing Engineer - Petrophysical Applications
Expertise: Chemical Engineering|Mechanical Engineering|Petroleum Engineering
Location: Houston, TX
 
United States Houston: Application Evaluation Specialist
Expertise: Drilling Engineering|Field Development
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $48.6/BBL 1.12%
Light Crude Oil : $46.34/BBL 1.24%
Natural Gas : $2.9/MMBtu 2.35%
Updated in last 24 hours