Jupiter Spuds Kazakh Well

(Click to Enlarge)

Jupiter Energy reported that the J-51 Exploration Well, located in the Mangistau basin in south-west Kazakhstan, spudded on July 30, 2011.

The surface location for J-51 is 2 km South West from J-50 and 1.7 km North West from J-52. J-51 is scheduled to take ~60 days to reach target depth of approximately 3200 meters and has been designed to evaluate the prospectivity of the primary Triassic and secondary Jurassic targets within the structure known as Akkar East.

The casing design is configured to allow the well to be used as a future production well.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours