Production Resumed at CNOOC's BoZhong Oilfileds

CNOOC announced its BoZhong 28-2 South (BZ 28-2S) oil fields, which suspended operation this past April, has re-commenced production.

The oil fields were suspended due to a malfunction that occurred on the single point mooring system of the Haiyangshiyou 102 FPSO. Production of BoZhong 28-2 South reached a level of about 39,000 bopd.

The BZ 28-2S project consists of four fields, including BZ 28-2 S, BZ 28-2 SN, BZ 34-1N and BZ 29-4. The company wholly owns and operates the fields. 

continue reading the full article


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Gas Storage Reservoir Engineer
Expertise: Petroleum Engineering
Location: Houston, TX
United States Odessa: Sr Field Engineer - Directional Drilling
Expertise: Directional Driller|Drilling Engineering
Location: Odessa, TX
Project Manager, Oil and Gas
Expertise: Petroleum Engineering|Project Management
Location: West Chicago, IL
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours