Production Resumed at CNOOC's BoZhong Oilfileds

CNOOC announced its BoZhong 28-2 South (BZ 28-2S) oil fields, which suspended operation this past April, has re-commenced production.

The oil fields were suspended due to a malfunction that occurred on the single point mooring system of the Haiyangshiyou 102 FPSO. Production of BoZhong 28-2 South reached a level of about 39,000 bopd.

The BZ 28-2S project consists of four fields, including BZ 28-2 S, BZ 28-2 SN, BZ 34-1N and BZ 29-4. The company wholly owns and operates the fields. 

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Technical Services Manager - Production Chemicals
Expertise: Chemist|Production Engineering|Stimulation
Location: Midland, TX
 
United States Houston: R&D Cementing Engineer - Petrophysical Applications
Expertise: Chemical Engineering|Mechanical Engineering|Petroleum Engineering
Location: Houston, TX
 
United States Houston: Application Evaluation Specialist
Expertise: Drilling Engineering|Field Development
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $48.6/BBL 1.12%
Light Crude Oil : $46.34/BBL 1.24%
Natural Gas : $2.9/MMBtu 2.35%
Updated in last 24 hours