Phoenix Drills Ahead at Marathon Well

Petsec advised that as at July 12, 2011, the Marathon #2 well had reached a measured depth of 18,845 feet (5,744 meters), 7 inch liner had been set and preparations were being made to drill ahead. The well is projected to reach its total depth of 21,000 feet (6,500 meters) within approximately 2 weeks.

The Marathon #2 well is a follow up to the successful #1 well and is situated in approximately 8 feet (2.4 meters) water depth and is located approximately 900 meters from the #1 well location. The #2 well is designed to serve as a development well for the field as well as to test deeper exploratory reserve potential on the Marathon structure.

Participating working interests in the well are:

  • Petsec Energy Ltd 8%
  • Phoenix Exploration Company LP (operator) 65%
  • Private Companies 27%
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Wellview and Spotfire Tech
Expertise: Production Technologist|Rig File Clerk
Location: Pittsburgh, PA
 
Production Technician
Expertise: Floorhand / Roughneck
Location: Carlsbad, NM
 
Coil Tubing Service Operators
Expertise: Floorhand / Roughneck
Location: Anchorage, AK
 
search for more jobs

Brent Crude Oil : $55.45/BBL 0.99%
Light Crude Oil : $52.37/BBL 1.20%
Natural Gas : $3.42/MMBtu 0.88%
Updated in last 24 hours