Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


Please enable Javascript to view this content.
advertisement

Mustang Completes Engineering Gig at Eni Nikaitchuq Facility

change text size

Mustang, a Wood Group company, provided the detail engineering, design and procurement services for two processing modules for the new Eni Nikaitchuq processing facility on the North Slope of Alaska, 60 miles west of Prudhoe Bay. The facility, which began oil production in late January 2011, has a treatment capacity of 40,000 BPD oil, 41,000 BPD produced water, 56,000 BPD source water and 6.1 MMscfd gas. In addition, the facility has a water injection capacity of up to 90,000 BPD water. Nikaitchuq is Eni's first operated development in Alaska.

Weighing approximately 4,000 tons each, the process and utilities modules were built in Louisiana and transported on barges through the Panama Canal to Alaska. The facility was designed to process 16-19 API oil with up to 2% sand content, to operate in –50°F arctic temperatures, to comply with the International Building Code, and to have minimal impact on the environment. These facilities allow Eni to ship sales-quality crude oil through the Trans-Alaska oil pipeline.

Mustang also provided detailed engineering for the integrated control and safety systems for the facility.

Related Companies

Most Popular Articles
From the Career Center
Jobs that may interest you
Fracturing Engineer- Lead Field Engineer
Expertise: Fracturing, Petroleum Engineering, Stimulation
Location: Williston, ND
 
Senior Production Engineer - Private E&P
Expertise: Petroleum Engineering, Production Engineering
Location: Denver, CO
 
Directional Drilling Optimization Engineer
Expertise: Directional Driller, Drilling Engineering, Petroleum Engineering
Location: Calgary, AB
 
search for more jobs