Drillings Ops Resume at Harvest Natural's Budong-Budong Block

Harvest Natural announced that drilling operations have resumed in its Budong-Budong Block. The KD-1 well spud on June 20, 2011, is the second of two planned exploration wells located in the Budong-Budong Block, onshore West Sulawesi, Indonesia.

The KD-1 well will be drilled to test a thrusted surface anticline with stacked Miocene and Eocene targets to a planned total measured depth of approximately 10,800 feet. Drilling is anticipated to require approximately 43 days. In the event of success, additional time may be required to test and evaluate the well.

Harvest owns a 64.4 percent non-operated working interest in the Budong-Budong Block PSC.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Floorhand - Job Fair May 31st
Expertise: Floorhand / Roughneck
Location: New Iberia, LA
 
Drilling Floorhand, Motorhand & Derrickhand
Expertise: Derrickman|Floorhand / Roughneck|Motorman
Location: Greeley
 
Drill Rig Operator
Expertise: Driller
Location: Harvey, LA
 
search for more jobs

Brent Crude Oil : $53.87/BBL 0.48%
Light Crude Oil : $50.73/BBL 0.79%
Natural Gas : $3.33/MMBtu 2.14%
Updated in last 24 hours