Texon Commences Drilling at Eagle Ford Well

Texon has advised that Tyler Ranch EFS #2H commenced drilling on June 12, 2011. This is the second Eagle Ford well in which Global Petroleum Limited ("Global") has an interest.

Tyler Ranch EFS #2H is located immediately north of the first Eagle Ford well ("Tyler Ranch EFS #1H") which had an initial production rate of 1,200 bopd. The well will have a 4,500 feet horizontal section similar to Tyler Ranch EFS #1H, and it is expected that drilling and casing operations will take 35 days. Fracture stimulation and testing of the well are scheduled for August.

Global has a 7.939% working interest (5.95% NRI) in Tyler Ranch EFS #1H and Tyler Ranch EFS #2H.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
U.S. Zanesville: Sr Field Engineer - Directional Drilling
Expertise: Directional Driller
Location: Zanesville, OH
 
United States Conroe: Entry Level Drill Bit Fabricator
Expertise: Driller
Location: Conroe, TX
 
United States Conroe: Entry Level Drill Bit Fabricator
Expertise: Driller
Location: Conroe, TX
 
search for more jobs

Brent Crude Oil : $55.49/BBL 2.45%
Light Crude Oil : $52.42/BBL 2.04%
Natural Gas : $3.2/MMBtu 5.04%
Updated in last 24 hours