Beach Starts Flow Stimulation at Holdfast-1

Beach advised that the flow stimulation of Holdfast-1 commenced over the weekend.

This is the first time flow stimulation has specifically targeted shale target zones at depth in the Cooper Basin, with the flow stimulation of Holdfast-1 to be undertaken in eight stages.

It is expected that the stimulation process will be completed within two weeks, after which the flow testing will commence (early July).

Participants in PEL 218 (Permian JV) are:

  • Beach (Operator) 90%
  • Adelaide Energy Ltd 10%
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Technical Services Manager - Production Chemicals
Expertise: Chemist|Production Engineering|Stimulation
Location: Midland, TX
 
United States Houston: R&D Cementing Engineer - Petrophysical Applications
Expertise: Chemical Engineering|Mechanical Engineering|Petroleum Engineering
Location: Houston, TX
 
United States Houston: Application Evaluation Specialist
Expertise: Drilling Engineering|Field Development
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $48.06/BBL 2.51%
Light Crude Oil : $45.77/BBL 2.17%
Natural Gas : $2.97/MMBtu 2.30%
Updated in last 24 hours