Otto Notes Drilling Ops at Duhat Well

Otto provided the following update on the progress of the Duhat-1 well. Since the last update, the well was drilled to 325m TVD (True Vertical Depth) in the 12 ¼" section before becoming stuck due to unstable hole conditions (similar to those experienced at this depth in the nearest offset well).

The well was subsequently plugged back to 224 meters TVD and successfully sidetracked. The well is currently drilling ahead at 295 meters TVD.

Geological prognosis is unchanged and rig performance is satisfactory to execute the work program.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Production Engineering
Location: Houston, TX
Senior Client / Program Manager
Expertise: Geologist|Reservoir Engineering
Location: Seattle, WA
Senior Sales Representative - Oil and Gas
Expertise: Corrosion Engineering|Petroleum Engineering|Sales
Location: Harvey, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours