Foster Wheeler Secures Statoil Snohvit Development Contract

Statoil has awarded a pre-front-end engineering (pre-FEED) contract to Global Engineering and Construction Group for the Snohvit future development project at Statoil’s Melkoya-based LNG facility on Melkoya Island about 280 miles (450 kilometers) north of the Arctic Circle, Hammerfest, Norway.

The company’s scope of work includes concept design activities in order to support the finalization of the development concept and of the plant capacity for the expansion of LNG production at the Melkoya LNG facility, as well as energy optimization investigations.

The existing Snohvit facility has a design capacity of 4.2 million tones per annum, and processes gas from the Snovhit and Albatross fields in the Barents Sea. Statoil serves as the operator, holding a 33.53% interest. Project partners include Petoro with 30%, Total with 18.4%, Gaz de France with 12%, Hess with 3.26% and RWE DEA with 2.81%.  

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Associate Chemist Oilfield Production Chemicals/ Fracturing
Expertise: Chemist|Fracturing
Location: Houston, TX
 
Controls Engineer - Creve Coeur, MO
Expertise: Electrical Engineering
Location: Creve Coeur, MO
 
Mid- Level Cadworx Piping Designer
Expertise: Piping Engineer
Location: Bellingham, WA
 
search for more jobs

Brent Crude Oil : $51.46/BBL 4.63%
Light Crude Oil : $48.9/BBL 4.78%
Natural Gas : $3.18/MMBtu 0.90%
Updated in last 24 hours