Statoil Submits Fast-Track Plan for Vigdis

Statoil has submitted a plan for development and operation (PDO) for the Vigdis North-East development to the Norwegian Ministry of Petroleum and Energy. Production is slated to begin in December 2012. Vigdis North-East is planned as a subsea development located about .99 miles (1.6 kilometers) from the existing subsea installation on the Vigdis field.

The field’s development will consist of a template with four wells, three producers and one water injector, connecting to the Snorre A field, located approximately 4 miles (7 kilometers) away. Produced oil and gas will be sent through a new pipeline to the existing Vigdis B template and then piped to Snorre A. Recoverable reserves are estimated at around 33 million barrels of oil equivalent. Statoil operates the field with a 41.5% interest.  

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Senior Contracts Manager
Expertise: Contracts Administration|Legal
Location: Atlanta, GA
 
Field Engineer - Punxsutawney, PA
Expertise: Engineering Technician|Petroleum Engineering
Location: Mt Braddock, PA
 
Field Engineer - Mt. Braddock, PA
Expertise: Engineering Technician|Petroleum Engineering
Location: Mt Braddock, PA
 
search for more jobs

Brent Crude Oil : $55.81/BBL 0.28%
Light Crude Oil : $53.4/BBL 0.07%
Natural Gas : $2.83/MMBtu 0.70%
Updated in last 24 hours