Statoil Submits Fast-Track Plan for Vigdis

Statoil has submitted a plan for development and operation (PDO) for the Vigdis North-East development to the Norwegian Ministry of Petroleum and Energy. Production is slated to begin in December 2012. Vigdis North-East is planned as a subsea development located about .99 miles (1.6 kilometers) from the existing subsea installation on the Vigdis field.

The field’s development will consist of a template with four wells, three producers and one water injector, connecting to the Snorre A field, located approximately 4 miles (7 kilometers) away. Produced oil and gas will be sent through a new pipeline to the existing Vigdis B template and then piped to Snorre A. Recoverable reserves are estimated at around 33 million barrels of oil equivalent. Statoil operates the field with a 41.5% interest.  

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
United States Broussard: Senior Field Engineer - MWD/LWD
Expertise: Field Development
Location: Broussard, LA
 
Expeditor
Expertise: Driller|Logistics Management|Materials Management
Location: Anchorage, AK
 
Rail Technical Manager Americas
Expertise: Logistics Management
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $54.46/BBL 0.96%
Light Crude Oil : $51.68/BBL 1.21%
Natural Gas : $3.44/MMBtu 1.99%
Updated in last 24 hours