Technip Bags TAQA Installation Contract for Falcon Field

TAQA Bratani has awarded Technip an installation contract for the development of the Falcon field, located in the UK sector of the North Sea in 525 feet (160 meters) of water.

The awarded contract includes project management and engineering; installation of an 6-inch production flexible flowline and a 4-inch gas lift flexible flowline; installation of a control umbilical and a subsea distribution unit, both free-issued; removal and replacement of a flexible riser; trenching and backfilling of the flowlines and umbilical; pre-commissioning, tie-ins and testing.

Offshore installation is scheduled for completion in the second half of 2011. First oil is expected from Falcon during the second half of 2011. 

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Engineer
Expertise: Engineering Manager
Location: Houston, TX
 
I&E Inspector
Expertise: Instrument & Controls Engineer|QA / QC / Inspection
Location: Freeport, TX
 
Sr. Project Manager
Expertise: Project Engineer|Project Management
Location: Odessa, 
 
search for more jobs

Brent Crude Oil : $50.97/BBL 1.53%
Light Crude Oil : $48.75/BBL 1.79%
Natural Gas : $2.92/MMBtu 0.68%
Updated in last 24 hours