Foster Wheeler Clinches Detail Design Contract in GOM

Enbridge Offshore awarded Foster Wheeler a detail design contract for the deepwater Walker Ridge Gathering System export gas pipelines and the deepwater Big Foot export oil pipeline, located in the Walker Ridge area of the Gulf of Mexico.

Work is planned for completion during the second quarter of 2011. The Big Foot field is located in Walker Ridge 29 in approximately 5,100 feet (1,554 meters) of water.  

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Drill Bit Fabricator
Expertise: Fabrication|Welding
Location: Conroe
 
SAM Technician
Expertise: Inventory Control
Location: Midland
 
Pipe Welders
Expertise: Welding
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $53.92/BBL 2.79%
Light Crude Oil : $51.08/BBL 2.66%
Natural Gas : $3.3/MMBtu 3.22%
Updated in last 24 hours