Drilling to Begin at Curlew Lake's Well

Curlew Lake announced well-site construction is complete for the FBA 9-14-57-24 W4M well, and a drilling rig is expected to arrive on site March 17th, 2011. The drilling target depth should be reached is less than one week.

The exploration hole is a New Pool Wildcat and is intended to evaluate a number of formations on the way to a target depth of 1116 meters. The primary targets in this well are at least two Ellerslie sedimentary channels.

A successful well will lead the way to a 3-D seismic survey on portions of Curlew lands in the township. Curlew Lake has a substantial position in Township 57, Range 24 West 4th Meridian that has not been shot using 3-D seismic and it is expected that multiple targets can be identified if 9-14 indicates a number of prospective targets.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Mechanical Engineer / Project Engineer
Expertise: Mechanical Engineering
Location: Miami
 
Directional Driller - South Texas
Expertise: Driller
Location: San Antonio, TX
 
Maintenance Mechanic
Expertise: Maintenance Technician|Mechanic
Location: Pecos, TX
 
search for more jobs

Brent Crude Oil : $50.2/BBL 3.29%
Light Crude Oil : $47.89/BBL 3.34%
Natural Gas : $2.94/MMBtu 1.37%
Updated in last 24 hours