Apache Ramps Up Production at Forties Bravo

The Forties Field
(Click to Enlarge)

Apache announced that interim repair work on the Forties Bravo to Charlie pipeline was completed, and production from the platform is ramping up to nearly 50% of the pre-outage rate of 11,600 bopd.

The replacement pipeline is scheduled for completion in September 2011, when the balance of the oil production is expected to be restored. The Forties field is situated on the UK Block 21/10 in a water depth of 106 meters, 112 miles (180 kilometers) from Aberdeen. Apache North Sea Limited holds a 97.14% interest of the field and serves as the operator; Esso Exploration and Production UK Limited holds 2.61%; and Shell U.K. Limited holds the remaining .25%. 

continue reading the full article


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Petroleum / Facilities Engineering Specialist - Offshore
Expertise: Petroleum Engineering
Location: Houston, TX
Petroleum Engineer
Expertise: Petroleum Engineering
Location: Houston, TX
Reservoir Engineering (Oil / Gas Reservoir Management)
Expertise: Reservoir Engineering
Location: Houston, TX
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours