Transeuro All Smiles over Ukraine Logging Ops

Transeuro issued a weekly update on its Ukraine operation as follows:

  • Logging operations have been completed successfully.
  • Current operation is rigging up to run 7 inch casing to TD (Total Depth).
  • Production test equipment has been mobilized to the site in preparation for the first production tests.

The President & CEO, David Worrall commented, "The preliminary analysis of the logs is in line with our expectations, and we have encountered deeper targets in the C15 and C16 that were not logged in the first wellbore in 2008. Analysis of the logging data is ongoing and the Company will shortly release the results and the final plans for the first production test."

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Production Control Coordinator
Expertise: Production Engineering
Location: Houston, TX
 
United States Rock Springs: Lead Field Engineer
Expertise: Petroleum Engineering
Location: Grand Junction, WY
 
Senior Engineer - Systems
Expertise: Subsea Engineering
Location: Wallingford, CT
 
search for more jobs

Brent Crude Oil : $53.87/BBL 0.48%
Light Crude Oil : $50.73/BBL 0.79%
Natural Gas : $3.33/MMBtu 2.14%
Updated in last 24 hours