Cooper Updates Menzel Horr Ops

Cooper reported that the Menzel Horr-1 well has been drilled to 1,639 meters and the 9 5/8" casing string has now been run and cemented to a depth of 1,638 meters.

Hole conditions prevented running open-hole logs over 727-1,639 meters and further potential evaluation of this section will be considered after the drilling of the primary targets.

The forward plan for the well is to drill out of the 9 5/8” casing to evaluate the Bou Dabbous and Abiod primary targets that are prognosed to exist deeper in the well.
 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Production Control Coordinator
Expertise: Production Engineering
Location: Houston, TX
 
Senior Engineer - Systems
Expertise: Subsea Engineering
Location: Wallingford, CT
 
United States Rock Springs: Field Engineer - Cased Hole
Expertise: Field Development|Field Service Tech
Location: Rock Springs, WY
 
search for more jobs

Brent Crude Oil : $53.61/BBL 2.09%
Light Crude Oil : $50.33/BBL 1.98%
Natural Gas : $3.26/MMBtu 2.51%
Updated in last 24 hours