Apache: Production Shut-In at Stag Field

Stag Production Facility
(Click to Enlarge)

Apache said that production has been shut-in at the Stag oil field and the BHP Billiton-operated Pyrenees floating production, storage and offloading vessel as a result of Tropical Cyclone Bianca.

As a result of repeated cyclone-related downtime, repairs to the production facility for the Van Gogh oil field off the coast of Western Australia are now expected to be completed by the end of the first week of February, with production expected to resume soon afterwards.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Production Engineering
Location: Houston, TX
Senior Client / Program Manager
Expertise: Geologist|Reservoir Engineering
Location: Seattle, WA
Senior Sales Representative - Oil and Gas
Expertise: Corrosion Engineering|Petroleum Engineering|Sales
Location: Harvey, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours