Apache: Production Shut-In at Stag Field


Stag Production Facility
(Click to Enlarge)

Apache said that production has been shut-in at the Stag oil field and the BHP Billiton-operated Pyrenees floating production, storage and offloading vessel as a result of Tropical Cyclone Bianca.

As a result of repeated cyclone-related downtime, repairs to the production facility for the Van Gogh oil field off the coast of Western Australia are now expected to be completed by the end of the first week of February, with production expected to resume soon afterwards.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Drilling Engineer
Expertise: Drilling Engineering
Location: Tulsa, OK
 
Technical Writer - Greeley Colorado
Expertise: Petroleum Engineering|Technical Writing
Location: Greeley, CO
 
Senior/Principal Industry Specialist - Oil & Gas
Expertise: Chemical Engineering|Mechanical Engineering|Petroleum Engineering
Location: Washington, DC
 
search for more jobs

Brent Crude Oil : $55.47/BBL 0.69%
Light Crude Oil : $52.48/BBL 0.30%
Natural Gas : $3.41/MMBtu 0.29%
Updated in last 24 hours