Apache: Production Shut-In at Stag Field


Stag Production Facility
(Click to Enlarge)

Apache said that production has been shut-in at the Stag oil field and the BHP Billiton-operated Pyrenees floating production, storage and offloading vessel as a result of Tropical Cyclone Bianca.

As a result of repeated cyclone-related downtime, repairs to the production facility for the Van Gogh oil field off the coast of Western Australia are now expected to be completed by the end of the first week of February, with production expected to resume soon afterwards.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Completions Supervisor Job
Expertise: Petroleum Engineering|Production Engineering|Workover or Completion
Location: Houston, TX
 
Production Engineer I Job
Expertise: Production Engineering
Location: Carlsbad, MN
 
Reservoir Engineer II Job
Expertise: Petroleum Engineering|Reservoir Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $53.96/BBL 0.35%
Light Crude Oil : $51.36/BBL 0.21%
Natural Gas : $3.209/MMBtu 0.34%
Updated in last 24 hours