QEP Wraps Up Ops at Johnson Bottom HZ Well

Uintah Basin
(Click to Enlarge)

Pacific Energy & Mining announced the successful completion of the JB 8G 21-7-21 delineation well at the Johnson Bottom Unit in Uintah County, Utah. The well was completed and placed on production during the month of September 2010.

QEP is the operator of the unit. The well was completed with two horizontal legs. All information on the well is confidential. The Johnson Bottom Unit is approximately 6,000 acres with two delineation wells drilled. Based upon the results of the wells additional development wells will be drilled.

Cisco Oil and Gas Field

Pacific Energy has placed on production three oil wells and is in the process of evaluating three additional wells to place on production. Currently, Pacific Energy has seven oil wells and one gas well on production. Six natural gas wells are awaiting a pipeline connection.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours