Aker Secures Oil Separation Contract in Brazil

Aker Solutions received a contract to design, build and supply heavy oil separation equipment for the OSX-1 FPSO for use on the Waimea field offshore Brazil. The new equipment will be supplied to convert the current light oil process system to heavy oil production. Delivery is planned for April 2011. The FPSO conversion project, being handled by BW Offshore in Singapore on behalf of OSX, is scheduled for May 2011. Located offshore Brazil in 427 feet (130 meters) of water, the Waimea field is situated in the BM-C-41 Block, which is wholly owned and operated by OGX.

continue reading the full article


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Project Manager
Expertise: Engineering Manager|Project Engineer
Location: Orlando, FL
Sr.Civil/Structural Engineer( Substation)- NY
Expertise: Civil Engineering
Location: Rochester, NY
Process Controls Engineer
Expertise: Electrical Engineering
Location: Detroit, MI
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours