Desire Runs into Problems at Rachel Sidetrack

Desire Petroleum has ceased drilling in the 14/15-1Z sidetrack well on the Rachel prospect in the North Falkland Basin. Due to wellbore stability issues through the deviated section of the wellbore, it was impossible to reach the targeted depth in the first wireline logging run, stated the operator. The hole will be cleaned prior to making another attempt. The Rachel prospect is located in Tranche D, and is operated by Desire Petroleum, holding a 92.5% interest; Rockhopper Exploration holds the remaining 7.5% interest.

continue reading the full article


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours