Roc Oil to Start Drilling Second Well in Cliff Head Program Friday, February 25, 2005 - Roc Oil reports that the CH-5 appraisal well has reached a Total Depth of 1,516 meters and completed wireline logging. As of February 25th the current operation was preparing to plug and abandon the well prior to the rig moving approximately 2.3 km to the northwest to drill CH-6. << back to article |
Image Description and Attributes | |
Image Description: | Perth Basin Location Map |
Keywords: | Perth Basin Location Map |
Type of Image: | Map |
Dimensions: | 500 pixels wide by 559 pixels tall |
Date Created: | Monday, February 21, 2005 |
Associated Regional Information | |
Region: | Austral-Asia (view more from this region) |
Country: | Australia (view more from this country) |
Articles Associated with this Image/Map: | |
- Roc Oil Begins Two Well Program at Cliff Head
[Monday, February 21, 2005]
- Roc Oil to Start Drilling Second Well in Cliff Head Program [Friday, February 25, 2005] - Roc Oil Spuds Cliff Head-6 Well [Monday, February 28, 2005] - Roc Oil Says Operations at Cliff Head-6 on Schedule [Monday, March 7, 2005] - Roc Oil Says Cliff Head-6 Reaches Total Depth [Thursday, March 10, 2005] - ARC Energy Spuds Jingemia 9 Well [Monday, August 15, 2005] - Origin Enregy Spuds Jingemia 6 Well [Wednesday, August 17, 2005] - ARC Energy Says Bartsia 1 Well a Duster [Monday, October 17, 2005] - AWE Seals Deal for Sale of Perth Basin Gas [Wednesday, August 18, 2010] - AWE IDs 13-20 Tcf of Shale Gas in Perth Basin [Tuesday, November 9, 2010] |