Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

Macondo Well Reaches Static Condition

change text size

Deepwater Horizon Gulf of Mexico Oil Spill

BP announced that the MC252 well appears to have reached a static condition -- a significant milestone. The well pressure is now being controlled by the hydrostatic pressure of the drilling mud, which is the desired outcome of the static kill procedure carried out yesterday (US Central time).

Pumping of heavy drilling mud into the well from vessels on the surface began at 1500 CDT (2100 BST) on August 3, 2010 and was stopped after about eight hours of pumping. The well is now being monitored, per the agreed procedure, to ensure it remains static. Further pumping of mud may or may not be required depending on results observed during monitoring.

The start of the static kill was based on the results of an injectivity test, which immediately preceded the static kill and lasted about two hour.

BP will continue to work with the National Incident Commander and other government officials to determine the next course of action, which involves assessing whether to inject cement in the well via the same route

The aim of these procedures is to assist with the strategy to kill and isolate the well, and will complement the upcoming relief well operation, which will continue as per plan.

A relief well remains the ultimate solution to kill and permanently cement the well. The first relief well, which started May 2, has set its final 9 7/8-inch casing. Operations on the relief wells are suspended during static kill operations. Depending upon weather conditions, mid-August is the current estimate of the most likely date by which the first relief well will intercept the Macondo well annulus, and kill and cement operations commence.

More info on the Deepwater Horizon Gulf of Mexico Oil Spill

Related Companies

Deepwater Horizon Images
Deepwater Horizon in Flames (Apr 20) In Situ Burn Training ROV Cutting Macondo Riser Gathered concentrated oil burns
Trajectory Forecast MS Canyon 252 Workers at A Decontamination Site Macondo Oil Slick (May 4) Cutting Macondo Riser
71 more images view image library

From the Career Center
Jobs that may interest you
Senior Product Engineer
Expertise: Production Engineering
Location: Houston, TX
 
Drilling Engineer - Houston (Permian Asset)
Expertise: Drilling Engineering
Location: Houston, TX
 
Discovery Supervisor
Expertise: ROV Tech/Pilot, Subsea Engineering
Location: Pasadena, TX
 
search for more jobs