ConocoPhillips received consent to continue to use the 2/7A, 2/7B and 2/7-FTP facilities and pipelines on the Eldfisk field until Dec. 31, 2015. The Eldfisk 2/7A and 2/7 Field Terminal Platform have a bridge connection and are part of the Eldfisk complex, together with the Eldfisk 2/7E water injection facility. Eldfisk 2/7B is located on the northern part of the field. Oil and gas is transported through two pipelines to the Ekofisk Complex.