StatoilHydro Secures Scarabeo 5 for Production Drilling at Tyrihans


Scarabeo 5
(Click to Enlarge)

Tyrihans Subsea Tie-Back
(Click to Enlarge)

Tyrihans to Kristin Pipelines
(Click to Enlarge)

StatoilHydro has received consent to use the Scarabeo 5 semisub for production drilling at Tyrihans.

The consent concerns wells 6406/3-D-1 H, D-2 H and D-4 H at Tyrihans. The well template has the following geographical coordinates:
N 64° 46' 47.1", E 6° 59' 26.6". Water depth at the site is 268 meters.

Planned start-up of the activity is November/December 2009. The operation has an estimated duration of 30 days.


 

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Senior Drilling Engineer Level IV
Expertise: Drilling Engineering
Location: Houston, TX
 
Drilling Engineer
Expertise: Drilling Engineering|Petroleum Engineering
Location: South Texas
 
Temporary SR. Subsea Engineer
Expertise: Subsea Engineer
Location: US GOM
 
search for more jobs

Brent Crude Oil : $53.38/BBL 0.15%
Light Crude Oil : $48.79/BBL 1.68%
Natural Gas : $2.89/MMBtu 2.48%
Updated in last 24 hours