StatoilHydro Taps Scarabeo 5 for Production Drilling on Asgard

Printer Friendly Version
Email this Page

Asgard Field Development
(Click to Enlarge)

Scarabeo 5
(Click to Enlarge)

The Petroleum Safety Authority has granted consent to StatoilHydro for use of the Scarabeo 5 semisub for production drilling and partial completion of the wells NO 6506/12-Q-5 and 6506/12-Y1H/Y2H on Asgard.

The wells are part of production license 094, which is centrally located in the Norwegian Sea at a water depth of approximately 300 meters.
Planned start-up of the activity is mid-August 2009. The operation has an estimated duration of approximately 112 days.
 

Printer Friendly Version
Email this Page
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Senior Reservoir Engineer, Oil Company
Expertise: Reservoir Engineering
Location: Texas, TX
 
Drilling Engineer - Contract position (Operator)
Expertise: Drilling Engineering
Location: Houston, TX
 
Junior Document Control Clerk
Expertise: Contracts Administration
Location: Houston, 
 
search for more jobs

Brent Crude Oil : $62.06/BBL 2.60%
Light Crude Oil : $57.71/BBL 0.55%
Natural Gas : $2.82/MMBtu 0.00%
Updated in last 24 hours