Marathon's Lobster Platform Sustains Damage to Lower Decks

Marathon

Marathon's Ewing Bank Block 873 Platform A (Lobster) has sustained damage on its lower decks. We are diligently working to make repairs and return the platform to production as safely and quickly as feasible. The platform serves as a hub for Ewing Bank 917 and Ewing Bank 963, with gross production averaging about 11,700 barrels of oil per day and about 10.5 million cubic feet of gas per day, prior to the storm.

 

Read more on the aftermath of Hurricane Ike in Rigzone's Special Coverage After the Storm.


Most Popular Articles