ConocoPhillips Gets Go Ahead to Use Norpipe Oil Pipeline Until 2028


Norpipe Oil Pipline
(Click to Enlarge)

Petroleum Safety Authority Norway has granted consent for ConocoPhillips Skandinavia AS (ConocoPhillips) to use the Norpipe oil pipeline until 2028.

The starting point for the pipeline is the Ekofisk 2/4-J facility. The pipeline has a diameter of 34" and is 354 kilometers long. It crosses the UK continental shelf and reaches land at Teesside in the UK. There is a connection point for the British fields about 50 kilometers west of Ekofisk.

The pipeline was constructed with an expected design life of minimum 20 years and commenced operations in 1975.

This consent applies to continued use of the Norpipe Oil Pipeline until the expiry of production license 018 in 2028.
 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Government Contracts Specialist
Expertise: Contracts Administration
Location: Louisiana, LA
 
Logistics Coordinators
Expertise: Logistics Management
Location: Offshore
 
Pump Shop Supervisor
Expertise: Facilities Management|Refinery / Plant Operations Supervisor|Welding Superintendent
Location: Watford City, ND, ND
 
search for more jobs

Brent Crude Oil : $52.21/BBL 2.06%
Light Crude Oil : $47.32/BBL 2.47%
Natural Gas : $2.72/MMBtu 1.80%
Updated in last 24 hours