Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

Recompletion Operations Resume at Telemark Hub

change text size

ATP Oil & Gas Corporation (ATPG) on Friday announced that it has resumed recompletion operations at the Mississippi Canyon (MC) 941 A-2 well at the company’s Telemark Hub. The recompletion was suspended while the company recovered a piece of tubing that was stuck in the casing. All of the tubing has now been removed from the casing.

The MC 941 A-2 recompletion operations to perforate and frac-pack the B upper and lower sands are expected to conclude during second quarter 2012. MC 941 is located in the Mirage Field at the Telemark Hub location utilizing the ATP Titan floating drilling and production platform.

ATP operates the ATP Titan and Telemark Hub which is in approximately 4,000 feet of water with a 100 percent working interest and holds a 100 percent ownership in ATP Titan LLC which owns the ATP Titan and associated pipelines and infrastructure.

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Please enable Javascript to view this content.

Most Popular Articles
From the Career Center
Jobs that may interest you
Subsea Equipment Engineer
Expertise: Mechanical Engineering, Subsea Engineering
Location: Houston, TX
 
Subsea Installation Engineer
Expertise: Installation Engineer, Structural Engineering, Subsea Engineering
Location: Houston, TX
 
Cement Equipment Operator
Expertise: Cementing, Heavy Machinery Operator
Location: Black Lick, PA
 
search for more jobs