Please enable Javascript to view this content.
Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


Please enable Javascript to view this content.
advertisement

Otto Upgrades Reserves at Galoc Field

change text size

Otto Energy Ltd. provided an update on remaining oil reserves balances at the Galoc oil field in the Philippines as at January 1, 2012.

Highlights:

  • Economic Ultimate Recovery (EUR) for the Galoc oil field has increased by 19.7% on a Proven (1P) and 3.5% on a Proven and Probable (2P) basis
  • Otto has remaining reserves life of approximately five years on a 2P basis from existing two production wells
  • Upgrade in reserves underpins plans for a Phase II development of the Galoc oil field, Final Investment Decision remains on target for mid-2012

The Operator, Galoc Production Company WLL, a 100 perccent subsidiary of Otto Energy Ltd, commissions an annual review of remaining oil reserves by independent consulting firm, RISC.

RISC has reviewed the Galoc oil field reserves in accordance with the SPE,WPC , AAPG and SPEE Petroleum Resource Management System definitions, guidelines and auditing standards.

Reported increases in reserves are attributable to better than expected reservoir performance to date and an extension of field life due to higher prevailing oil prices. The Galoc oil field is expected to remain in production until approximately 2016 to 2018 on the basis of the existing two wells alone.

Otto Energy estimates Contingent Resources of 1.49 MMboe (Otto share) at 2C level attributable to the Galoc Phase II development, currently progressing through Front End Engineering and Design, with a target Final Investment Decision around mid-2012.
A detailed breakdown of Reserves is shown in Appendix A.

Otto's Chief Executive Officer Mr. Gregor McNab said, "Galoc oil field continues to be a key asset for Otto Energy, delivering valuable cashflow to fund future growth opportunities. These upgrades to our 1P and 2P reserves confirm our ability to maintain production for several years to come and comes ahead of the anticipated approval for Galoc Phase II around the middle of this year."

Related Companies
Please enable Javascript to view this content.

Most Popular Articles
From the Career Center
Jobs that may interest you
Subsea Controls Engineer
Expertise: Instrument & Controls Engineer, Subsea Engineering
Location: Houston, Texas, TX
 
Sr. Reservoir Engineer
Expertise: Petroleum Engineering, Reservoir Engineering
Location: Pittsburgh, PA
 
Production Engineer
Expertise: Production Engineering
Location: Midland, TX
 
search for more jobs