Amerisur Spuds Platanillo-3 Well

Amerisur Resources announced Tuesday that it has spudded the well Platanillo-3 in the Platanillo Field, Colombia, the first of a planned six well drilling campaign.

As previously reported, the Serinco D-10 drilling rig was recently mobilised to the Platform 9 location and was rigged up and tested before beginning operations on 5 April. Drilling began through a pre-set 13.3/8" conductor pipe. The well has currently reached approximately 3,000 feet (914 meters) and operations are continuing according to plan.

The total planned depth of the well is 8,280 feet (2,523 meters) and the Company expects to have electric log and test results from the well during May 2012.

Amerisur CEO John Wardle commented: "I am very pleased we have begun our exciting drilling programme, which has been designed on the basis of our 3D/3C seismic analysis and aims to substantially increase our reserve base and deliver our 5,000 BOPD target by the end of this year."

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Top Drive Technician
Expertise: Mechanical Technician|Rig Electrician|Rig Mechanic
Location: Williston, ND
 
Senior Drill Rig Operator
Expertise: Drilling Foreman|Gas Plant Operations|Rig Manager
Location: Farmington, NM
 
Drilling Instructor
Expertise: Driller|Instructor / Trainer
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $50.68/BBL 0.35%
Light Crude Oil : $46.75/BBL 1.08%
Natural Gas : $2.73/MMBtu 3.01%
Updated in last 24 hours