Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

ATP Anticipates First Production at Mississippi Canyon

change text size

As of February 2, 2012, ATP has completed the drilling of the Mississippi Canyon (MC) 942 #2 well to a measured depth of 21,400 feet. As previously noted, three productive sands have been logged with at total of 239 feet of pay. ATP has set 7-5/8 inch casing across the B and C Sands and a 5-1/2 inch liner through the S Sand. The S Sand, at a depth of 21,010 to 21,090 feet, has been perforated and completed.

After completion of the next regularly scheduled BOP test, ATP will move to the completion of the C Sand which will be perforated at a depth of 17,560 to 17,730 feet. As soon as the C Sand is completed, ATP will begin completing the B Sand which will be perforated at a depth of 17,410 to 17,480 feet. An additional BOP test will be required before the completion of the B Sand.

ATP estimates first production immediately upon completing these activities scheduled during first quarter 2012. Plans are to begin production in the S Sand. ATP intends to comingle the B and C Sands with the S Sand when the pressure equalizes between the three sands.

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies

Most Popular Articles
From the Career Center
Jobs that may interest you
Reservoir Engineer
Expertise: Petroleum Engineering, Reservoir Engineering
Location: Midland, TX
 
Sr. Reliability/Risk Engineer ( Upstream Oil & Gas)
Expertise: Drilling Consultant, Regulatory Compliance, Reliability Engineer
Location: Houston, TX
 
Field Engineer
Expertise: Field Development
Location: Buckhannon, WV
 
search for more jobs