| Employer: |
Fircroft Inc.
Updated: May 31 2012
|
| Desired Expertise: |
Petroleum Engineering, Production Engineering, Reservoir Engineering, artificial lifts, frac, |
| Experience: |
5+ years |
| Minimum Education: |
Bachelors/3-5 yr Degree |
| Location: |
Sewickley, PA, US |
| Employment Type: |
Full Time Salaried Employee |
| Job Status: |
Closed - No longer accepting applications
|
|
Job posting bookmarked!
|
|
Job Description:
|
 Our major oil and gas client is seeking a Wells Production Technologist for a direct hire opportunity in Sewickey, Pennsylvania.
Responsibilities:
The role for this Production Technologist is to provide planning and oversight of the production technology aspects of field development. Work will initially focus on artificial lift, compression planning and completion optimization. This individual will work closely with the Operations Surveillance Team and the Completions and Well Intervention Team, to test potential solutions in the field.
Requirements:
- Seasoned technical professional with at least five years experience and a good understanding of EP business
- Work experience in selecting, implementing and evaluating different artificial lift methods
- Work experience in Well Completions especially well fracturing/stimulation
- Work experience in Well Surveillance and compresion planning desired
- Good understanding of statistical data analysis
- Experience with two phase flow and IPSC modeling
- Good team player, able to build solid working relationships with peers both inside and outside
- Familiar with and committed to Health Safety and Environment.
|
This Position Is Closed to New Applicants
This position is no longer open for new applications. Either the position has expired or was removed because it was filled.
However, there are thousands of other great jobs to be found on Rigzone.
Similar Jobs Currently Available
|