Rig Construction Details
| Classification: |
ABS |
| Rig Design: |
LeTourneau Class 116-C |
| Built By: |
Marathon LeTourneau at the Singapore shipyard
|
| Delivery Year: |
1983 |
| Flag: |
Marshall Islands |
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
Lee C Moore 167' x 30' x 30'; Capacity: 1,250,000 lbs; Hook + Setback: 1,850,000 lbs |
| Drawworks: |
National Oilwell 1625-DE 2,000 HP |
| Mud Pumps: |
3 x National Oilwell 12-P-160 Driven by two GE 752 motors, 1600 HP |
| Top Drive: |
National Oilwell PS-2 650/650, 1500 HP |
| Rotary Table: |
National Oilwell 37.5 in. diameter Model C-375 |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|