Rig Construction Details
| Classification: |
ABS |
| Rig Design: |
Pace Marine Pace 85 |
| Shipyard: |
Channelview TX
|
| Delivery Year: |
1982 |
| Flag: |
US |
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
Pyramid 148' x 30' x 30'; Capacity: 1,000,000 lbs |
| Drawworks: |
National Oilwell 1320-UE 2,000 HP |
| Mud Pumps: |
2 x National Oilwell 12-P-160 Triplex, each driven by two 800HP electric motors, 1600 HP;
1 x Lewco WS-1300 triplex pump driven by 1 Caterpillar 3512 diesel engine, 1300 HP |
| Top Drive: |
Varco IDS-1 500 ton capacity with single rail torque tube |
| Rotary Table: |
National 37.5 in. diameter Model C-375 |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|