Rig Construction Details
| Classification: |
ABS |
| Rig Design: |
Baker Marine Services BMC-160-C |
| Shipyard: |
Nobara Santos Brazil
|
| Delivery Year: |
1983 |
| Flag: |
Marshall Islands |
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
Lee C Moore 147' x 30' x 30'; Capacity: 1,000,000 lbs |
| Drawworks: |
Mid Continent 1220-UE 2,000 HP |
| Mud Pumps: |
2 x Continental Emsco FB-1600 Triplex; each driven by two GE 752 DC electric motors, 1600 HP |
| Top Drive: |
CanRig 1050E |
| Rotary Table: |
Gardner Denver 37.5 in. diameter |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|