Rig Construction Details
| Classification: |
DNV |
| Rig Design: |
Global Maritime Consultancy GM-4000D |
| Built By: |
at the CIMC Raffles, China shipyard
|
| Delivery Year: |
2010 |
| Flag: |
Bahamas |
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
NOV 160' x 35' x 35'; Hook + Setback: 1,300,000 lbs ; Racking: 15,000,000 lbs |
| Drawworks: |
|
| Mud Pumps: |
3 x NOV HEX 240 7500 PSI, 2540 HP |
| Top Drive: |
NOV HPS-650-E-AC-SG, 1000 HP |
| Rotary Table: |
NOV 60.5 in. diameter Model D-605 Hydraulic drive |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|