Rig Construction Details
| Classification: |
DNV |
| Rig Design: |
Aker H-3 Enhanced |
| Shipyard: |
Aker Group Bergen Norway
|
| Delivery Year: |
1975 |
| Flag: |
Singapore |
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
Maritime Hydraulics 160'; Capacity: 1,323,000 lbs |
| Drawworks: |
Emsco C3-II |
| Mud Pumps: |
3 x Continental Emsco FB-1600, 1600 HP |
| Top Drive: |
Maritime Hydraulics DDM-550, 1100 HP |
| Rotary Table: |
Varco 49.5 in. diameter Model D495 Hydraulic drive |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|