Rig Construction Details
| Classification: |
ABS |
| Rig Design: |
Samsung hull design |
| Built By: |
Samsung at the Samsung, Geoje, South Korea shipyard
|
| Delivery Year: |
2012 |
| Flag: |
|
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
NOV 200' x 80' x 60'; Racking: 2,000,000 lbs |
| Drawworks: |
NOV SSGD-5750 |
| Mud Pumps: |
4 x NOV 14-P-220 Triplex, belt driven ea by 2 GEB22A3 AC motors |
| Top Drive: |
NOV HPS-1000-2E-AC 1000 t capacity, driven by 2 GEB20B AC motors, incl 115000 ft/lbs pipe handler |
| Rotary Table: |
NOV 60.5 in. diameter Model RST 1000 t capacity, (1) only hydraulic driven |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|