Rig Construction Details
| Classification: |
DNV |
| Rig Design: |
Gotaverken GVA 4000 |
| Shipyard: |
Sweden
|
| Delivery Year: |
1983 |
| Flag: |
Marshall Islands |
Construction costs, dimensions, capacities, and dozens of other fields of data on each rig are available via RigLogix. |
|
|
Rig Equipment
| Derrick: |
UIE 160' x 40' x 40'; Capacity: 1,250,000 lbs |
| Drawworks: |
National Oilwell 1625-DE 3,000 HP |
| Mud Pumps: |
3 x National Oilwell 12-P-160 triplex, 1600 HP |
| Top Drive: |
Varco TDS-4S |
| Rotary Table: |
National 49.5 in. diameter Model C-495 |
Detailed specs on each piece of rig equipment from BOPs to Winches are available via RigLogix. More than 100 searchable data points. |
|